English

One Stop Solution Platform of Kinds of Airport GSE & Aviation ULD

Place of Origin:
Anhui, China (Mainland)
Model Number:
CM800-W3
Usage:
Transport
Lead Time:
30 day(s) after payment received
Structure:
Platform
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:


Cheerong has to go through the following production stages. They include metal materials preparation, cutting, polishing, and mechanical assembly.
Cheerong is developed blending in various disciplines. Knowledge such as computer science, information technology, automatic control technology, and mechanical engineering are considered and adopted in its development.
Cheerong is designed considering its operation processes. They include stress points, support points, yield points, wear resistance, toughness, friction force, etc.
Cheerong has passed the following function tests. It has to be tested in terms of mechanism cycling, actuators, and electrical checking.
During the quality inspection of Cheerong , different inspecting approaches will be adopted. It will be checked by visual examination, radiographic inspection, or magnetic crack detection.
The product is guaranteed to be always at its best quality by our stringent quality management system.
Product Message
Chat Online
Chat Online
Leave Your Message inputting...